Thermal excursion in Site 7 Hall C
- Window
- 21 Oct 2026, 10:12 UTC → 22 Oct 2026, 07:00 UTC (20 h 48 min)
- Affected
- KIRIN-9 fabrication, Containment
- Reference
- site-7-hall-c-thermal-excursion
-
resolved
The Office of Harmony has completed its review. No ZNSI mind left its sanctioned substrate. Hall C has been unsealed and its pods are returning to service. The pump controller had received a configuration change shortly before the excursion. The origin of the change is under investigation.
-
monitoring
Coolant temperatures in Hall C are back within range. The hall remains sealed while the Office of Harmony reviews the excursion.
-
identified
A pump controller in Hall C's secondary cooling loop is not responding to commands. Hall C has been sealed. Workload from the affected Shōgi pods has moved to Halls D and E. MUGEN inference is not affected.
-
investigating
Coolant temperature in two Shōgi pods in Site 7 Hall C has risen above its set point. We are investigating.