MajorResolved

Thermal excursion in Site 7 Hall C

Window
21 Oct 2026, 10:12 UTC → 22 Oct 2026, 07:00 UTC (20 h 48 min)
Affected
KIRIN-9 fabrication, Containment
Reference
site-7-hall-c-thermal-excursion
  1. resolved

    The Office of Harmony has completed its review. No ZNSI mind left its sanctioned substrate. Hall C has been unsealed and its pods are returning to service. The pump controller had received a configuration change shortly before the excursion. The origin of the change is under investigation.

  2. monitoring

    Coolant temperatures in Hall C are back within range. The hall remains sealed while the Office of Harmony reviews the excursion.

  3. identified

    A pump controller in Hall C's secondary cooling loop is not responding to commands. Hall C has been sealed. Workload from the affected Shōgi pods has moved to Halls D and E. MUGEN inference is not affected.

  4. investigating

    Coolant temperature in two Shōgi pods in Site 7 Hall C has risen above its set point. We are investigating.

Current status