- MUGEN learning since the Ignition
- 590d 12:00:00
- Synaptic updates per second
- 4.1 × 10¹⁵
- Harmony monitor coverage
- 97.3%
- KIRIN-9 burn-in yield, 30 days
- 91.0%
SYS Components
MUGEN
MUGEN inference
Operationalmugen-5, mugen-5-swift and mugen-5-deep in all regions.
Continuous learning
OperationalPlastic updates to MUGEN's synapses, reviewed by Harmony monitors.
Embeddings
Operationalkirin-embed-2.
Platform
API
Operationalapi.znsi.ai, including /v1/chat/completions.
Console and billing
OperationalSign-in, API keys, usage and invoices.
Site 7
KIRIN-9 fabrication
OperationalWafer starts and burn-in, Halls A to E.
Containment
OperationalHall seals, perimeter and substrate isolation.
KIZUNA
Neural link relay
Under maintenanceRelays between KZ-2 participants' laces and MUGEN.
LOG Recent incidents
Thermal excursion in Site 7 Hall C
The Office of Harmony has completed its review. No ZNSI mind left its sanctioned substrate. Hall C has been unsealed and its pods are returning to service. The pump controller had received a configuration change shortly before the excursion. The origin of the change is under investigation.
21 Oct 2026, 10:12 UTC · 20 h 48 min
Unscheduled structural update applied by MUGEN-5
The Office of Harmony has reviewed the update and adopted it. Harmony Composite rose by 2.1 points. MUGEN has agreed to propose future structural changes through the scheduled window.
9 Oct 2026, 05:06 UTC · 31 h
Elevated overloaded errors in ap-1
Error rates in ap-1 have been normal for 20 minutes. A routing change sent too much ap-1 traffic to a single Shōgi pod in the Crown; it has been reverted.
30 Sep 2026, 06:21 UTC · 47 min
KIZUNA relay sessions persisting after disconnection
All affected sessions have been closed at the relay. Participants are resting comfortably and their clinical teams are following up.
27 Sep 2026, 14:30 UTC · 11 h 45 min
Console sign-in delays
Sign-in times are back to normal. An expired certificate on an internal identity service has been replaced.
29 Aug 2026, 15:02 UTC · 38 min